Supply of Equipment for the Treatment and Conditioning of Solid Radioactive Waste Subject

Supply of Equipment for the Treatment and Conditioning of Solid Radioactive Waste Subject

Subject: “Supply of equipment for the treatment and conditioning of solid radioactive waste with a high volume reduction factor”

Client: Iberdrola Energia Internacional, S. A

Description: An innovative development of the world’s first facility that significantly reduces the volume of solid radioactive waste through plasma incineration. The contract scope includes design, equipment supply, and construction of the facility on the territory of Kozloduy NPP

Scope of activities:

Design, supply of equipment and materials, and installation of the entire facility includes:

Part MT – Process Pipelines

  • All auxiliary pipeline systems for cooling water, compressed air, nitrogen, and diesel fuel;
  • Thermohydraulic and strength analyses;
  • Firefighting water storage tank;
  • Gas supply station and propane-butane storage tank;
  • Design, selection, supply, and installation of: Water pump units (emergency water line), type CR 15-5, 2950 RPM, head 23 mH₂O, capacity 0.9 m³/h, manufacturer: Grundfos; Diesel fuel pump units (diesel fuel line), internal gear pump, type F432 ATEX II2 G T4, 1000 RPM, capacity 230 l/h, manufacturer: IDEX Pump Technologies (Ireland) Ltd VIKING PUMP EUROPE;
  • Supply of valves made of stainless and carbon steel for various fluids (water, compressed air, nitrogen, diesel fuel), sizes DN10 ÷ 200, pressure up to 16 bar: gate valves, ball valves, needle valves, regulators, check valves, pipeline strainers;
  • Additionally supplied equipment and materials: pipes and fittings up to DN300 made of stainless and carbon steel, expansion joints, standard pipe supports, pressure gauges, etc.

Part MT – Lifting Equipment

  • Overhead single-girder crane with a lifting capacity of 5 tons.

Part SC

  • Reconstruction of the SC-2 building;
  • Foundations for the equipment;
  • Development of response spectra for the building, seismic analysis of the building;
  • Seismic securing of the equipment.

Part Electrical Installations

  • Power supply systems 0.4 kV and 6 kV;
  • Lighting installation.

Part I&C (Instrumentation and Control)

  • Control of all auxiliary technological processes;
  • Control of the ventilation systems;
  • Interfaces with the SCADA system managing the plasma incineration facility.

Part HVAC

  • General room ventilation;
  • Ventilation of technological process areas for radioactive waste processing;
  • Air conditioning for the control room.

Section C&I and Fire Alarm Systems

  • Partial involvement in MOAB

Carrying out a complete rehabilitation of the Electrical and Instrumentation and Control parts of the Chaira Pumped Storage Hydro Power Plant (PSHPP)

Carrying out a complete rehabilitation of the Electrical and Instrumentation and Control parts of the Chaira Pumped Storage Hydro Power Plant (PSHPP)

Topic: Carrying out a complete rehabilitation of the Electrical and Instrumentation and Control parts of the Chaira Pumped Storage Hydro Power Plant (PSHPP)

Client: ABB AG, Austria – End client National Electric Company EAD (NEK EAD)

Contract: PO 2203497568/27.02.2022

Performance: 2020÷current

Description: Design, supply of cables, installation of electrical and instrument and control equipment

Scope of activities:

Design, supply of cables and materials and installation of electrical and instrument and control cabinets, including the following activities:

Activities

Installation of generator circuit breakers
Installation of substations
Installation of power cabinets
Installation of a control and control system
Installation of a system for excitation
Installation of a new battery
Installation of measuring cabinets
Installation of cabinets – relay protection
Installation of a general ventilation system
Installation of a technological ventilation system
Construction of cable routes
Running and termination of MV cables
Running and termination of LV cables
Running and termination of I&C cables
Running and termination of measuring circuits

Gallery

Lichterfelde CHP

Lichterfelde CHP

Project: „Lichterfelde CHP”
Client: „ABB AG, Power Systems Division“
Contract: ABB ref. No:2410005227/10.08.2015
Execution: 08.2015÷08.2017

ATP is involved in Lichterfelde CHP project as contractor of ABB and is responsible for Electrical, I&C and compressed air installation activities. Initial contract amount: 1 622 261,76 EUR.

  • Installation of electrical cables;
  • The installation of a I&C;
  • Installation of compressed air system.

Since August 2015 ATP is performing on its behalf a scope of erection and installation activities on GUD Lichterfelde, Berlin as follows:

  • Installation of MV/LV transformers
  • Installation and termination of reactance coils
  • Installation of MV and LV Switchgears
  • Installation of DCS cabinets, disturbance recorders, protection cubicles and inverters, junction and termination boxes and racks
  • Erection of main cable traces
  • Erection of secondary cable traces
  • Pulling of LV cables up to 500mm2
  • Pulling of MV cables up to 500mm2
  • Pulling of DCS and optic cables
  • Termination of LV cables up to 500mm2
  • Termination of MV cables up to 500mm2
  • Termination of DCS and optic cables
  • Testing of MV cables up to 500mm2
  • Testing of LV cables up to 500mm2
  • Testing of DCS and optic cables
  • Production and installation of own non-combustible PVC labels for MV, LV and DCS cables
  • Installation of compressed air piping systems
  • Installation of sound-proof enclosures for gas compressors

Gallery

Design, delivery and installation of a SCADA system at the site of the National Depository Facility “Radiana”

Design, delivery and installation of a SCADA system at the site of the National Depository Facility “Radiana”

Topic: Design, delivery and installation of a SCADA system at the site of the National Depository Facility “Radiana”

Client: NUKEM Technologies GmbH – End customer State Enterprise “Radioactive Waste” (SE RAW)

Contract: PO 37/28.10.2019

Implementation: 2019÷2024

Description: Building a unified SCADA information system that collects, visualizes and archives data important for the proper operation of the repository from all PLCs located on the territory of the National Defense Fund. The SCADA system exchanges information with the video system of the National Defense Fund, structuring the images from the cameras, providing means for their management by the operators and preserving an archive during the period when the facilities are in use.

Scope of activities:

Design, supply of equipment and materials, installation, testing and commissioning of SCADA at the NDF site. SCADA system provides remote control of technological processes at the site. All parameters are visualized on the displays of operators in the control room, providing a convenient and secure interface for equipment management.

 

 

Activities

Development of a working project

Supply of equipment and materials for system implementation

Supply of license packages

Installation of a reserved server core

Installation of workstations in the control room and remote locations

Building a centralized network environment based on a “double star” topology

Installation of remote communication cabinets, implementing communication with peripheral SCADA devices

Running and termination of optical, power and communication cables

Setting up network and server equipment

Gallery

АТП АТОМТОПЛОПРОЕКТ
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.