Topic: Carrying out a complete rehabilitation of the Electrical and Instrumentation and Control parts of the Chaira Pumped Storage Hydro Power Plant (PSHPP)
Client: ABB AG, Austria – End client National Electric Company EAD (NEK EAD)
Contract: PO 2203497568/27.02.2022
Performance: 2020÷current
Description: Design, supply of cables, installation of electrical and instrument and control equipment
Scope of activities:
Design, supply of cables and materials and installation of electrical and instrument and control cabinets, including the following activities:
Activities
Installation of generator circuit breakers
Installation of substations
Installation of power cabinets
Installation of a control and control system
Installation of a system for excitation
Installation of a new battery
Installation of measuring cabinets
Installation of cabinets – relay protection
Installation of a general ventilation system
Installation of a technological ventilation system
Construction of cable routes
Running and termination of MV cables
Running and termination of LV cables
Running and termination of I&C cables
Running and termination of measuring circuits