Topic: “Improving the reliability of the battery and rectifier of DG42-DGS-2-V”
Client: “Kozloduy NPP” EAD
Contract: No. 128000042/09.09.2022
Implementation: 2022÷2023
Description: Design, supply, installation and commissioning of the battery and rectifier of DG42-DGS-2, cell V
Scope of activities:
Design, supply of equipment and materials and installation of the entire facility, including the following activities:
Part SK
- Instructions for dismantling the starting equipment;
- Installation plan of the new equipment;
- Construction and construction solution with necessary details required for the implementation of the new equipment;
- Drawings of the metal supporting structure of the rectifier;
- Drawings of the metal structure of the AB;
- Analysis proving the seismic resistance of the new equipment.
Electrical Installations Part
- Expanded diagram of the power supplies;
- Drawings of operational circuits;
- Assembly diagrams;
- Cable log;
- Requirements for the installation of the new AB;
- Requirements for the installation of the rectifier;
- Lighting installation.
HVAC Part
- Assessment of the general ventilation of the room;
- Adoption of design decisions in order to achieve the necessary regulatory parameters (if necessary).