Increasing the reliability of the battery and rectifier of the DG42-DGS-2-V

Topic: “Improving the reliability of the battery and rectifier of DG42-DGS-2-V”

Client: “Kozloduy NPP” EAD

Contract: No. 128000042/09.09.2022

Implementation: 2022÷2023

Description: Design, supply, installation and commissioning of the battery and rectifier of DG42-DGS-2, cell V

Scope of activities:

Design, supply of equipment and materials and installation of the entire facility, including the following activities:

Part SK

  • Instructions for dismantling the starting equipment;
  • Installation plan of the new equipment;
  • Construction and construction solution with necessary details required for the implementation of the new equipment;
  • Drawings of the metal supporting structure of the rectifier;
  • Drawings of the metal structure of the AB;
  • Analysis proving the seismic resistance of the new equipment.

Electrical Installations Part

  • Expanded diagram of the power supplies;
  • Drawings of operational circuits;
  • Assembly diagrams;
  • Cable log;
  • Requirements for the installation of the new AB;
  • Requirements for the installation of the rectifier;
  • Lighting installation.

HVAC Part

  • Assessment of the general ventilation of the room;
  • Adoption of design decisions in order to achieve the necessary regulatory parameters (if necessary).

Gallery

АТП АТОМТОПЛОПРОЕКТ
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.