Preparation of hydraulic calculation of TCS – Kozloduy and evaluation of the possibility of joining new subscribers

Project: „Preparation of hydraulic calculation of TCS – Kozloduy and evaluation of the possibility of joining new subscribers”
Client: „NPP – Kozloduy“
Contract: №268000010/18.05.2016
Execution: 06.2016÷01.2017

In order to evaluate the current state of the heat transmission network in the town of Kozloduy, a large scale scheme of the city has been drawn up and the pipelines and cameras are drawn according to the drawings and schemes from the documentation of the contracting authority. The exact locations of the cameras (shafts) are coordinated with GPS on site.

A computational model of the heat transmission network based on the scale map has been developed. The evaluation of the TCS capabilities is based on statistics from the last 3 heating seasons. The check was carried out using the maximum average load for the given period for each consumer with a 20% margin. The computational model has minimal conservatism in order to mimic the real situation of the system.

Gallery

Certificate