Project: „Lichterfelde CHP”
Client: „ABB AG, Power Systems Division“
Contract: ABB ref. No:2410005227/10.08.2015
Execution: 08.2015÷08.2017
ATP is involved in Lichterfelde CHP project as contractor of ABB and is responsible for Electrical, I&C and compressed air installation activities. Initial contract amount: 1 622 261,76 EUR.
- Installation of electrical cables;
- The installation of a I&C;
- Installation of compressed air system.
Since August 2015 ATP is performing on its behalf a scope of erection and installation activities on GUD Lichterfelde, Berlin as follows:
- Installation of MV/LV transformers
- Installation and termination of reactance coils
- Installation of MV and LV Switchgears
- Installation of DCS cabinets, disturbance recorders, protection cubicles and inverters, junction and termination boxes and racks
- Erection of main cable traces
- Erection of secondary cable traces
- Pulling of LV cables up to 500mm2
- Pulling of MV cables up to 500mm2
- Pulling of DCS and optic cables
- Termination of LV cables up to 500mm2
- Termination of MV cables up to 500mm2
- Termination of DCS and optic cables
- Testing of MV cables up to 500mm2
- Testing of LV cables up to 500mm2
- Testing of DCS and optic cables
- Production and installation of own non-combustible PVC labels for MV, LV and DCS cables
- Installation of compressed air piping systems
- Installation of sound-proof enclosures for gas compressors