Lichterfelde CHP

Project: „Lichterfelde CHP”
Client: „ABB AG, Power Systems Division“
Contract: ABB ref. No:2410005227/10.08.2015
Execution: 08.2015÷08.2017

ATP is involved in Lichterfelde CHP project as contractor of ABB and is responsible for Electrical, I&C and compressed air installation activities. Initial contract amount: 1 622 261,76 EUR.

  • Installation of electrical cables;
  • The installation of a I&C;
  • Installation of compressed air system.

Since August 2015 ATP is performing on its behalf a scope of erection and installation activities on GUD Lichterfelde, Berlin as follows:

  • Installation of MV/LV transformers
  • Installation and termination of reactance coils
  • Installation of MV and LV Switchgears
  • Installation of DCS cabinets, disturbance recorders, protection cubicles and inverters, junction and termination boxes and racks
  • Erection of main cable traces
  • Erection of secondary cable traces
  • Pulling of LV cables up to 500mm2
  • Pulling of MV cables up to 500mm2
  • Pulling of DCS and optic cables
  • Termination of LV cables up to 500mm2
  • Termination of MV cables up to 500mm2
  • Termination of DCS and optic cables
  • Testing of MV cables up to 500mm2
  • Testing of LV cables up to 500mm2
  • Testing of DCS and optic cables
  • Production and installation of own non-combustible PVC labels for MV, LV and DCS cables
  • Installation of compressed air piping systems
  • Installation of sound-proof enclosures for gas compressors

Gallery

АТП АТОМТОПЛОПРОЕКТ
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.