Design of a duplicate suction pipeline for decarbonated water pumps in EP2 (HVO) chemical water treatment plant

Project: „Design of a duplicate suction pipeline for decarbonated water pumps in EP2 (HVO) chemical water treatment plant”
Client: „NPP – Kozloduy“
Contract: № 244000004/15.07.2014 г.
Execution: 07.2014 ÷ 08.2015

A duplicate suction line for pumps for decarbonated water from pipe elements and fittings Ø450, PE100, HDPE is designed. The connection to the existing collector was made through specially designed quad made of steel 20. In addition, at the request of the Employer, a knee of 180 ° was also designed and made of steel 20.

The site is constructed on an existing concrete site of the HVO workshop.

Gallery

Certificate

АТП АТОМТОПЛОПРОЕКТ
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.