Design of a duplicate suction pipeline for decarbonated water pumps in EP2 (HVO) chemical water treatment plant

Project: „Design of a duplicate suction pipeline for decarbonated water pumps in EP2 (HVO) chemical water treatment plant”
Client: „NPP – Kozloduy“
Contract: № 244000004/15.07.2014 г.
Execution: 07.2014 ÷ 08.2015

A duplicate suction line for pumps for decarbonated water from pipe elements and fittings Ø450, PE100, HDPE is designed. The connection to the existing collector was made through specially designed quad made of steel 20. In addition, at the request of the Employer, a knee of 180 ° was also designed and made of steel 20.

The site is constructed on an existing concrete site of the HVO workshop.

Gallery

Certificate