138 Secondary Schools“ Prof. Vasil Zlatarski “, Slatina district, Sofia

Project: „Investment project based on recommended energy-saving activities for 138 Secondary Schools“ Prof. Vasil Zlatarski “, Slatina district, Sofia“
Client: Stolichna Municipality
Contract: № РД-55-101/12.03.2012
Implementation: 03.2012÷07.2013

Part Architectural

On the facade are replaced all the unplanned windows, showcases and doors that do not meet the standards for energy efficiency, namely the metal window on the staircase, the old aluminum window to the staircase in the lobby on the ground floor, the metal door of the kitchen to the courtyard courtyard and the entrance to the basement door with a superstructure to the secondary staircase to the tall building. They are replaced by aluminum windows with insulated thermal bridge and double glazed windows or metal windows with thermal insulation for the doors. Take action from the spot!

The subcutaneous plaster on the facades and eaves is demolished and a new lime-cement plaster on the lining is made in all places where it is missing.

Thermal insulation with EPS of 7 cm thickness is performed and the top polymer plaster in the color specified in the project (sample!) Is applied to all facades of the three buildings of the school building. All openings and outer corners are framed with PVC profiles.

An EPS thermal insulation of 10 cm thickness is carried out below the bay window above the ground floor above the entrance, and a smooth polymeric plaster with PVC profile is refracted from below.

All window sills in front of the windows with aluminum widths of the required width are lined. Take action from the spot!

All the window sills between the windows with aluminum widths of the required width, which overlap those of the windows, are lined. Take action from the spot!

Thermal insulation is made of lined mineral wool 12 cm thick, glued to the ceilings of all rooms on the top floors.

Suspended ceilings made of non-combustible drywall at the heights specified in the project below the thermal insulation in the last floors – cassettes, cassettes 60/60 cm with built-in lighting fixtures for all rooms and a dense suspended ceiling of non-combustible drywall in the lobby of the third floor. Take action from the spot!
Waterproofing of two layers of cross reinforced veil, glued to the existing waterproofing, is performed on all roofs of the school.

A new paneling on the staircase is made of galvanized sheet metal on a standing rebate. Take action from the spot!

New gutter pipes are being installed from the roofs of the three buildings, and their installation is in accordance with the new facade thermal insulation.

Part Electro

Replacement of power cables for floor boards with three and five cores. From the main panels, two floor lines radially feed the floor panels, in each of which the construction of a duty bus is provided, from which the new evacuation and duty lighting in the corridors is supplied.

The old luminaires are replaced with luminescent tubes, 4x18w, electronic PRA, which are installed in the suspended ceilings in the presence of such and outdoor installation in rooms without a suspended ceiling. In the case of filament lamps / LNG /, the luminaires are replaced by compact fluorescent lamps / CFLs/.

Gallery

References

АТП АТОМТОПЛОПРОЕКТ
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.