Project: „Lichterfelde CHP”
Client: „ABB AG, Power Systems Division“
Contract: ABB ref. No:2410005227/10.08.2015
Execution: 08.2015÷08.2017

 

ATP is involved in Lichterfelde CHP project as contractor of ABB and is responsible for Electrical, I&C and compressed air installation activities. Initial contract amount: 1 622 261,76 EUR.

Since August 2015 ATP is performing on its behalf a scope of erection and installation activities on GUD Lichterfelde, Berlin as follows:

  • Installation of MV/LV transformers
  • Installation and termination of reactance coils
  • Installation of MV and LV Switchgears
  • Installation of DCS cabinets, disturbance recorders, protection cubicles and inverters, junction and termination boxes and racks
  • Erection of main cable traces
  • Erection of secondary cable traces
  • Pulling of LV cables up to 500mm2
  • Pulling of MV cables up to 500mm2
  • Pulling of DCS and optic cables
  • Termination of LV cables up to 500mm2
  • Termination of MV cables up to 500mm2
  • Termination of DCS and optic cables
  • Testing of MV cables up to 500mm2
  • Testing of LV cables up to 500mm2
  • Testing of DCS and optic cables
  • Production and installation of own non-combustible PVC labels for MV, LV and DCS cables
  • Installation of compressed air piping systems
  • Installation of sound-proof enclosures for gas compressors