Project: „On-line monitoring system and maintenance of the main primary circuit chemistry parameters (PSC OLM) of Units 5 and 6 of Kozloduy NPP”
Client: „NPP – Kozloduy“
Contract:  №
Execution: 2006÷2007

Description: Implementation of an automatic system to monitor the parameters of water chemistry for primary circuit of Units 5 and 6 of Kozloduy NPP. Scope of contract relates to consulting services and operation engineering of the overall system.

Implementation of the system for operational monitoring and maintenance parameters COMS primary circuit – PSC / OLM “, is part of the modernization program of units 5 and 6 of NPP” Kozloduy “filed as a measure 49,111.
Compared to carry out periodic monitoring until the introduction of the measure 49 111 system for automatic monitoring and maintenance of basic parameters of water chemistry regime primary circuit of units 5 and 6 of NPP “Kozloduy” (PSC / OLM), provides almost continuous information about basic chemical parameters of fluids circulating in the containment zone of Units 5 and 6.
Providing quick and safe access to information on basic parameters of water chemistry regime primary circuit, in combination with timely taking appropriate remedial actions by the operating personnel, ensures the maintenance of optimal parameters of fluid from the primary circuit through the life of power units which has a significant positive influence on the proper, long-lasting and safe operation of NPP “Kozloduy